Foundation flooded badly?

Job Details

  • Crew Members: 2
  • Start Date: January 21st, 2016
  • Finish Date: February 9th, 2016
  • Location: Eugene, Oregon

Service provided

  • Trenched drainage line
  • Installed drain pipe and sub pump
  • Drained foundation and cleaned up water damage
  • Poured new concrete curb

Images

Trenching1 Trenching2 Pipe-install1 Pipe-install2 Pipe-install2 Pipe-install1 Pipe-install2 Subpump Drain1 Finish1